3. Industrial Fan Assembly
3.7
Align the Clevis Pin Holes in the Downrod with the
Holes in the Motor Yoke. Install the Clevis Pin and
secure with the Hairpin Clip (Figure 7).
The Clevis Pin must go through the Holes in the Motor
Yoke. It is critical that the Clevis Pin in the Motor Yoke
is properly installed and securely tightened.
Failure to verify that the Pin is properly installed could
result in the Fan falling (Figure 7).
WARNING
!
It is critical that the clevis pin in the motor coupling
is properly installed. Failure to verify that the pin is
properly installed (as shown in Figure 7) could result
in the fan falling.
3.8
Reinstall the previously removed Two 5/16-18 Set
Screws in the Motor Yoke (Figure 8).
While pulling up on the Hanger Ball, securely tighten
both Set Screws against the Downrod using the Allen
Wrench, supplied.
WARNING
!
It is critical that the set screws are securely tightened.
Failure to verify that the set screws are properly
installed (as shown in Figure 8) could result in the fan
falling.
3.9
The Fan comes with Brown, Blue, and Grey Wires that
are 80-inches long.
Before installing the Fan, measure up approximately
6 to 9-inches above top of Hanger Ball/Downrod
Assembly (Figure 9).
Cut off excess Wires and strip back insulation 1/2-inch
from end of Wires.
Please call Customer Service at 1-800-777-4440
if you have any questions about installation and
operation of this Ceiling Fan.
(Continued)
HAIRPIN
CLIP
Figure 7
HANGER BALL/
DOWNROD ASSEMBLY
MOTOR YOKE
Figure 8
6 TO 9
INCHES
1/2
INCH
Figure 9
Please contact 1-800-777-4440 for further assistance
7
MOTOR
YOKE
CLEVIS
PIN
5/16-18 SET
SCREW (2)
ALLEN WRENCH
BROWN WIRE
BLUE WIRE
GREY WIRE
SAFETY CABLE
HANGER
BALL
luminancebrands.com
ETL Model No.: HF1161