Front View
Centerline
of Brace
of Brace
9/16" (1.4 cm)
Water Supply
Rough-In
Top View
Optional Angle-Poise
of Shelf
Mirror Rough-In Location
4"
(10.2 cm)
2. Roughing-In
Plumbing
IMPORTANT! The rough-in plumbing must extend 3" (7.6 cm)
beyond the finished wall.
Remotely locate the shut-off valves (for example, below the
vanity).
Install the rough plumbing according to the roughing-in
information shown. Notch the brace, if needed.
Install the finished wall.
Angle-Poise Mirror (Optional)
Using a 2-1/2" hole saw, cut a hole at the "Optional Angle-Poise
Mirror Rough-In Location" on the shelf.
Remove any debris from the cutting process.
1059558-2-A
Centerline
of Lavatory
Water Supply
3" (7.6 cm)
Rough-In
10-1/2" (26.7 cm)
8" (20.3 cm)
21" (53.3 cm)
4
Kohler Co.