STEP 2
A.
lnsert both adjustable upright tubes (09) into the upright assemblies (05 R&L). Secure the adjusta ble upright
tubes (09) with knob boits (31) as shown.
B.
lnsert the safety hooks (30 RJL) into the top of the adjustable upright tu bes (09). Secure the safety hooks
(30 RJL) with nylon nuts (50).
C.
lnsert two weight plate posts (14) into the side of the upright assemblies (OSR&L). Secure the weight plate
post (14) with two washers (SI) and two hex head boits (47) as shown below.
NOTE
Do not over-tighten the safety
hook nylon nuts!
50