Close - SMA SUNNY HIGHPOWER PEAK1 Instrucciones De Instalación

Ocultar thumbs Ver también para SUNNY HIGHPOWER PEAK1:
Tabla de contenido

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

SMA Solar Technology AG
Figure 29: Do not connect PV to ground
Figure 30: DC connection area
INFORMATION
Cables with multi-strand, fne-strand or extra
fne-strand conductors can be used for DC
connection. The cables must be suitable for a
temperature of at least 75°C.
When using fne-strand or extra f ne-strand
conductors, bootlace ferrules must be used for
the connection.
Installation Guide
Figure 31: Cables with different conductors (from top to
bottom): multi-strand, fne-strand and extra
fne-strand
1. Switch the DC load-break switch on the inverter
to "Off" and, if available, also on the PV array
junction box.
2. Connect the PV cables from the PV array junction
box to the inverter. When doing so, ensure the
correct polarity.
3. All conductors must be properly attached with
the correct tool (screwdriver bit, length min. 50
mm) and correct torque, see Section 9.4,
page 48.

5.12 Close

Closing the inverter with one-piece enclosure
lid:
1. Insert the intermediate frame into the inverter and
tighten the eight fastening screws (TX25, torque:
6 Nm).
SHP75-10-STP60-10-IA-xx-19
5 Installation
31

Publicidad

Tabla de contenido

Solución de problemas

loading

Este manual también es adecuado para:

Sunny tripower 60Shp 75-10Stp 60-10

Tabla de contenido