Place the cover on the housing and tighten it by turning it clockwise. To
7.
ensure O-ring compression, the cover must be fully seated against the
housing when the threads are tightened.
Turn the M3 set screw against the housing until the screw contacts the
8.
housing.
Reconnect power to the beacon.
9.
10. Test the beacon by applying power and verifying the pattern.
Figure 9 Location of DIP switch for flash patterns
Figure 10 Switch settings for flash patterns
ON
Steady On
1 2 3
ON
Blink ( 60 S PM)
1 2 3
ON
Swell (60 SPM)
1 2 3
ON
Strobe Simulation
1 2 3
Model G-LED Global Series LED Beacon
Installation and Maintenance Instructions
ON
Rotate
Counterclockwise
1 2 3
ON
Rotate Clockwise
1 2 3
ON
Waggle
1 2 3
ON
Pinwheel
1 2 3
STEADY ON (DEFAULT)
19