1 - Mounting Base
14
Cable length
900m
A.
Create a concrete foundation
with an empty conduit and
lay all the cables in the center
of the foundation.
B.
Ensure the cables have
appropriate excess length
for the remaining installation.
C.
Open the packaging and
obtain the mounting parts
needed for the installation.