About This Guide; Safety Instructions - ABB SREA-50 Guia De Instalacion Y Inicio Rapida

Tabla de contenido

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

Quick installation and start-up
guide – SREA-50

About this guide

This guide contains the very basic information on the installation
and start-up of the SREA-50 remote monitoring adapter. For
complete documentation, see SREA-50 remote monitoring adapter
product manual (3AUA0000098875 [English]).

Safety instructions

WARNING! Ignoring the following instructions can cause
physical injury or death, or damage to the equipment.
Only qualified electricians are allowed to install and maintain
the inverter!
Disconnect the inverter into which the adapter will be installed
from all possible power sources (see the inverter product
manual for further details). After disconnecting, always wait for
5 minutes to let the intermediate circuit capacitors discharge
before you proceed.
Always ensure by measuring with a multimeter (impedance at
least 1 Mohm) that:
there is no voltage between the input power terminals of
the inverter and the ground
there is no voltage between the output power terminals of
the inverter and the ground.
Do not work on the control cables when power is applied to the
external control circuits of the inverter. Externally supplied
control circuits may carry dangerous voltage.
Quick installation and start-up guide – SREA-50 3

Publicidad

Tabla de contenido
loading

Tabla de contenido