5  LCS tool
10. The LCS-Tool prompts for a confirmation of the selected
country and grid code. In case of battery storage
systems, the battery details are additionally shown.
A wrong configuration can be changed by clicking the
[Back] button and by changing the settings in the
previous window.
11. The system then applies the grid code selected on the
Inverter Manager to the detected inverters. Any
inverter added at a later stage automatically inherits
the same grid code. The application of only one grid
code is possible per Inverter Manager.
INFORMATION
It is essential to choose the correct grid code.
A modification after the first ten operating hours have
passed is only possible with a personal SMA Grid
Guard code.
The grid code parameters can be changed
subsequently with the LCS-Tool (see
section 5.2.7, page 28). Prerequisite is the use of the
latest version of the LCS-Tool.
12. A green square identifies the commissioned inverters.
The inverters are only connected to the utility grid when
the [Start] command has been carried out from the bar
below the start menu (see figure 14).
Figure 14: LCS-Tool - list of all inverters connected to the Inverter
Manager
18
IMVIOBOX-IA-xx-16
SMA Solar Technology AG
Installation Manual