SMA INVERTER MANAGER DIGITAL I/O BOX LCS-TOOL Instrucciones De Instalación página 8

Tabla de contenido

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

3  Inverter Manager
Pin
Assignment for
10/100 Mbps
7
---
8
---
3.3.5 Connecting the I/O Box and
Weather Station (Optional)
Do not connect during operation
Do not connect the I/O Box or the weather station to
the Inverter Manager during operation. Errors might
occur that cannot be detected immediately.
• Disconnect the Inverter Manager from voltage
sources.
Pin assignment of the serial interface (RS485) at the Inverter
Manager:
1
2
3
4
6
7
8
Figure 5: Pin assignment of the serial interface
The I/O Box must be connected to port 2 of the Inverter
Manager. Termination for the RS485 interface is not
necessary.
Pin
1
2
3
4
5
6
7
8
Interfaces and Data of the Weather Station
Only one weather station can be connected to each Inverter
Manager. The weather station must be connected to port 1
of the Inverter Manager. A maximum of two temperature
sensors are supported.
The following data of the weather station are provided by
the Inverter Manager:
8
IMVIOBOX-IA-xx-16
Assignment for
1000 Mbps
TRD(3)+
TRD(3)-
5
9
Assignment
---
---
DataB(+)
DataA(-)
GND
---
---
---
Meteorological
SunSpec
data
Modbus
TCP
Ambient
yes
temperature and
PV temperature
Wind direction
yes
and wind speed
Horizontal
yes
irradiation
Inclined
no
irradiation
3.3.6 Connecting the
Inverter Manager to the Voltage
Supply
Danger to life due to electric shock from touching
an ungrounded product
Touching an ungrounded product can cause a lethal
electric shock.
• Ensure that the product is integrated into the existing
overvoltage protection.
• Ground the enclosure of the product.
Procedure:
To connect the Inverter Manager to the voltage supply,
perform the following actions in the specified order.
• Connect the grounding conductor to the
Inverter Manager.
• Connect the power supply unit.
Connecting the Grounding Conductor to the
Inverter Manager
Shielded ground: The shielded ground (also called
"protected ground") is located at the pin connector for the
electrical connection in the displayed view.
Procedure:
• Ground the Inverter Manager. For this purpose,
connect the grounding conductor to the grounding
screw of the Inverter Manager. Proper grounding and
the correct cable route help limit possible interference
emissions due to electromagnetic interferences (EMI).
SMA Solar Technology AG
LCS-Tool /
Sunny
FTP Push
Portal
yes
yes
yes
yes
yes
If inclined
irradiation is
not
available
yes
yes
Installation Manual