Operating The Unit - Allmand PORT-A-LITE Manual Del Operador

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

 Work Surface 
The portable work light must be placed on a firm, stable
surface capable of supporting the total weight of the work
light. The surface should be level, and must not exceed a
grade of 5% (2.8° incline) in any direction. 
WARNING
 Rollover / Tipover Hazard. 
Positioning the portable work light on soft or unstable
ground could cause work light rollover resulting in death or
serious injury. Always position the work light on a firm, level
and stable surface. 

Operating The Unit

To Operate The Unit
 
 
1.  Connect the LED fixture.  
 
 Loosen the cable tie. Connect the base cable to the
fixture cable. 
2.   Position the LED fixture. 
 
8
The LED fixture may be rotated left / right, and up /
down. 
3.  Raise the mast to the desired height.  
 
1.  Pull the latch spring pin and rotate it 90°. 
2.  Raise the inner mast to the desired height. There are
four holes in the inner mast that may be used. 
3.  Rotate the latch spring pin 90° and engage one of
the four holes in the inner mast. Be sure the latch
spring pin is fully seated in the hole. 
4.  Connect the power cord and turn on the work light.  
 
 
1.  Connect the power cord to a wall outlet or power
generator.
Note: If an extension cord is required, use an extension
cord rated for the current required by the work light.
See  Specifications  for detailed information on power
requirements. 
2.  Move the power switch to the ON position. 
To Shut Down The Unit
 

Publicidad

Capítulos

Tabla de contenido
loading

Tabla de contenido