Final Assembly - Luminance Brands Kathy Ireland Home LURAY ECO El Manual Del Propietario

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

8.1
Screw the Two Threaded Studs (supplied) into the
Tapped Holes in the Hanger Bracket (Figure 29).
8.2
Lift the Ceiling Cover up to the Threaded Studs and
turn until Studs protrude through the Holes in the
Ceiling Cover (Figure 30).
Secure the Ceiling Cover in place by sliding
Lockwashers over the Threaded Studs and installing
the Two Knurled Knobs (supplied). (Figure 30).
Tighten the Knurled Knobs securely until the Ceiling
Cover fits snugly against the Ceiling and the Hole in the
Ceiling Cover is clear of the Downrod.
WARNING
!
To avoid possible fire or shock, make sure that the
electrical wires are completely inside the outlet box and
not pinched between the ceiling cover and the ceiling.
Please call Customer Service at 1-800-777-4440
if you have any questions about installation and
operation of this Ceiling Fan.

8. Final Assembly

Figure 29
Figure 30
17
THREADED
STUDS (2)
Please contact 1-800-777-4440 for further assistance
CEILING
COVER
THREADED
STUDS (2)
LOCKWASHERS (2)
KNURLED
KNOBS (2)
luminancebrands.com
ETL Model No.: CF860

Publicidad

Tabla de contenido
loading

Tabla de contenido