Installation Instructions - Acuity Brands AEDAN Instrucciones De Seguiridad-Instalacion Manual Operativo

Ocultar thumbs Ver también para AEDAN:
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

INSTALLATION INSTRUCTIONS

STEP-BY-STEP GUIDE
DO NOT EXERT PRESSURE IN THE MIDDLE OF OLED PANELS. WEAR GLOVES DURING INSTALLATION. NOTE: TURN OFF
POWER ON CIRCUIT BREAKER BOX!
1.
1
2.
2
2a.
2b.
6
Remove fixture components and parts pack(s). Check that all parts are included. Assistance
may be required to support fixture during installation.
INSTALL JUNCTION BOX AND PULL WIRES THROUGH: Prior to wiring the fixture,
disconnect ALL power supplies to the unit. Make all wiring connections inside the junction
box. The fixtures should be wired in accordance with NEC and applicable local codes and
ordinances.
Select desired location on ceiling and install a recessed junction box (4" octagonal or full-size
round j-box, supplied by others).
Connect 120V AC power to the junction box and pull wires through (AC power hot BLACK,
neutral WHITE, ground GREEN, and optional dimmer leads PURPLE and GREY).
(Figure 2b)

Publicidad

Tabla de contenido
loading

Tabla de contenido