Descargar Imprimir esta página

nVent RAYCHEM E-100-A Instrucciones De Instalación página 5

Ocultar thumbs Ver también para E-100-A:

Publicidad

Idiomas disponibles

Idiomas disponibles

5
• Pull heating cable back through bottom
of end seal stand until braid is just
visible above strain relief. Use cable
lubricant if needed.
7
• Install cap; tighten until the slot on the cap and the slot
on the stand align.
8
• Fasten end seal to pipe with strap. Do not
pinch heating cable.
• Install cable tie.
• Loop and tape extra heating cable to pipe.
• Apply insulation and cladding.
• Weather-seal the stand entry.
• Fasten end seal label to insulation.
• Leave these installation
instructions with the user for
future reference.
Braid
Strain
relief
Cable tie
Pipe strap
6
CAUTION: Health Hazard. Wash hands after
contact with sealant. Consult material safety data
sheet VEN 0058.
AVERTISSEMENT: risque pour la santé. Se laver
les mains après tout contact avec le produit
d'étanchéité. Consulter la fiche de données de
sécurité VEN 0058.
• Push boot onto the end of the heating cable
until it bottoms out.
CAUTION: To avoid pinching the heating cable,
be sure the cable is not under the pipe strap.
ATTENTION: Pour éviter de pincer le câble
chauffant, assurez-vous que le câble ne se
trouve pas sous la sangle du tuyau.
Trim
Note: For 1 in (25 mm)
and smaller pipes use
adapter (purchased
separately) between
stand and pipe.
JBS-SPA
Glass cloth tape
adapter for
small pipes
Position
adapter
this side
up.
nVent.com/RAYCHEM | 5

Publicidad

loading