Descargar Imprimir esta página

nVent RAYCHEM JBS-100-A Instrucciones De Instalación página 3

Publicidad

Idiomas disponibles

Idiomas disponibles

1
• Allow approximately 24 in (60 cm) of heating
cable for installation. For VPL, cut cable
12 in (30 cm) from bus indentation.
• Cut off heating cable end at about
45° for easier insertion.
24 in
(60 cm)
3
• Lightly score outer jacket around and down as shown.
• Bend heating cable to break jacket at score, then peel
off jacket.
Do not cut braid.
12 in
45°
(30 cm)
Indentation (bus wire
connection on VPL
heating cables only).
7 1/2 in
(190 mm)
2
• Optional: If stand is to be installed on
bottom side of pipe, knock out drain
hole prior to inserting cable.
• With label on stand facing desired
direction of box opening, push 18 in
(45 cm) of heating cable through
stand. Use cable lubricant if needed.
• Square off cable end with 90° cut.
Drain
hole
4
BTV and QTVR
XTV and KTV
VPL
HTV
18 in
(45 cm)
Label on stand
indicates
direction of
box opening.
• Do not attach
stand to pipe
until step 12.
Go to Step 5A
Go to Step 5B
Go to Step 5C
Go to Step 5D
nVent.com/RAYCHEM | 3

Publicidad

loading

Este manual también es adecuado para:

Jbs-100-a6