Descargar Imprimir esta página

nVent RAYCHEM JBS-100-A Instrucciones De Instalación página 6

Publicidad

Idiomas disponibles

Idiomas disponibles

6
• Mark the jacket
as shown.
8
• Push core sealer onto the heating cable to the mark made in step 6.
Note: Extra force may be required for larger cables or at lower
temperatures.
10
• Slip the green/yellow tube onto the braid.
Heat-shrinking is not required.
• Trim bus wires and braid.
1/2 in
(13 mm)
6 | nVent.com/RAYCHEM
5/8 in
(15 mm)
Make sure the bus
wires do not kink,
bunch, or crossover.
1/2 in
(13 mm)
7
CAUTION: Health Hazard.
Wash hands after contact with sealant. Consult
material safety data sheet VEN 0058.
AVERTISSEMENT: risque pour la santé. Se laver les
mains après tout contact avec le produit d'étanchéité.
Consulter la fiche de données de sécurité VEN 0058.
• If needed, re-twist and straighten bus wires, then
insert into the guide tubes as shown.
Make sure all strands
go into the tubes.
9
• Remove the guide tubes and dispose
of them in a plastic bag.
11
• Pull heating cable back into stand so 1 in (25 mm) is exposed as
shown. Use cable lubricant if needed.
Tubes
1 in (25 mm)

Publicidad

loading

Este manual también es adecuado para:

Jbs-100-a6