Descargar Imprimir esta página

nVent RAYCHEM JBS-100-A Instrucciones De Instalación página 5

Publicidad

Idiomas disponibles

Idiomas disponibles

5C
• Push braid back
and bunch as tight
as possible.
• Lightly score inner
jacket around and
down as shown.
• Peel off inner jacket.
• Unwind heating
element, cut and
remove as shown.
• Lightly score clear
jacket around and
down as shown.
• Bend heating cable to
break jacket at the score
then peel off jacket.
• Push braid
forward. Use
a screwdriver
to open braid
as shown.
• Bend heating cable
and work it through
opening in braid.
• Remove insulation
from ends of
bus wires.
• Pull braid tight to
make pigtail.
VPL
6 in
(152 mm)
6 in
(152 mm)
1/2 in
(13 mm)
Go to Step 6
5D
• Push braid back
to create
a pucker.
• At pucker use a
screwdriver to
open braid.
• Bend heating cable
and work it through
opening in braid.
• Score inner jacket
and conductive core
around and down as
shown.
• Peel off inner
jacket.
• Flip the cable 180ºC
and score the other
side of inner jacket
and conductive
180°
core.
• Remove the inner
jacket, conductive
core by using
needle-nose pliers
as shown.
• Score and remove
center insulation.
• Remove any remaining
material from bus wires.
• Pull braid tight to
make pigtail.
HTV
6 1/2 inches
(165 mm)
180°
6 1/2 inches
(165 mm)
Go to Step 6
nVent.com/RAYCHEM | 5

Publicidad

loading

Este manual también es adecuado para:

Jbs-100-a6