Descargar Imprimir esta página

noken SMART LINE 100210496_N386000067 Instrucciones De Instalación página 6

Publicidad

5. Complete supply plumbing connections as installation requires.
Deisgn S.A.
6. Cut the cistern flush pipe to size 'Y' remember that the large end of the pipe
requires 35mm to project into the cistern valve. It is recommended to
position the pan and check measurements before cutting.
Remember to allow for the projection into the toilet inlet.
7. When satisfied with fit, push the black inlet flush cone connector supplied
onto the narrow end of the flush pipe.
8. When satisfied that the WC and flush pipe are correctly positioned push the
black WC inlet connector securely into the WC inlet.
9. Make waste connections as required for the application using suitable waste
connection refer to a qualified plumber, and loosely fix the WC as per WC
manufacturers instruction.
10. When the WC is loosely in position, ensure rubber seal is in position as
shown, then tighten the coupling nut on the flush valve to ensure a leak
proof joint. Ensure the flush pipe and black inlet flush cone connector are
firmly in place in the WC.
11. Now place the pre-cut front panel (see furniture manufacturers instructions)
between the WC and cistern and check the WC to the flush pipe and waste
connections. If installing behind tiled or construction remember to allow
access to the cistern for maintenance and final settings.
6
recommend that this is completed by a qualified plumber.
X + depth of inlet on
Rubber seal
Coupling nut
Pre cut
flush bend
Noken

Publicidad

loading