Sartorius PMA.Vision Instrucciones De Instalación página 98

Balanzas para la mezcla de pinturas en áreas potencialmente explosivas de la zona 1
Ocultar thumbs Ver también para PMA.Vision:
Tabla de contenido

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

This certifies that the equipment described has been found to comply with the following
Approval Standards and other documents:
CSA C22.2 No. 0.4
CSA C22.2 No. 157
CSA C22.2 No. 213
CAN/CSA-C22.2 No. 60079-0
CAN/CSA-C22.2 No. 60079-11
CAN/CSA C22.2 No. 61010-1
Original Project ID:
Subsequent Revision Reports / Date Approval Amended
Report Number
FM Approvals LLC
J.E. Marquedant
Manager of Electrical Systems
To verify the availability of the Approved product, please refer to www.approvalguide.com
FM Approvals HLC 5/13
98
Installation Instructions VIS1X
2013
1992 (R2012)
1987 (R2013)
2011
2014
2004
0003055566
Date
Report Number
3055566C
Page 3 of 3
Approval Granted: February 29, 2016
Date
29 February 2016
Date

Publicidad

Tabla de contenido
loading

Tabla de contenido