Descargar Imprimir esta página

Cequent Performance Products 30095 Instrucciones De Instalación página 10

Publicidad

Idiomas disponibles

Idiomas disponibles

Read pages 1-3 of these instructions before starting installation. Failure to do so could result in significant vehicle damage!
Front of Vehicle
PARTS LIST.
View Pg. 1 for complete list of parts
3. Place the long tube spacer(12) into the bed sill. Place the filler spacer(4) into the bed corrugation either above the bed, if
the hole is in the bottom of the corrugation or below the bed if the hole is in the top of the corrugation. Place the short tube
spacer(10) on the filler spacer(4). Set the rail in position. Install the 6" long carriage bolt(9) through the top of the rail and
out through the bottom of the bed sill.
4. Place the U-shaped bracket(16) over the bolt. Install the 5/8" serrated washer(13) and the 5/8" nut(14) on the bolt(9). Hand
tighten the nuts.
wheel legs installed in the rails, mark the locations in the rear rail to be drilled. Drill an 1/8" pilot hole. See the
th
5. With the 5
diagram on the previous page for hole location. Be sure that the angled bracket will align with the 1/8" pilot hole. See the
diagram above. The angle brackets are to be installed from the inside of the frame. Left and right angled brackets may be
interchanged if it helps to get the bracket installed on the frame. Drill the pilot hole out to 21/32".
6. Place the filler spacer(4) in the bottom of the bed corrugation if the hole is in the bottom. Place the filler spacer(4) under the
bed corrugation if the hole is in the top of the corrugation. Place the short tube spacer(10) over the hole. Set the rear rail
over the tube spacer(10).
7. Insert the short carriage bolt(5) down through the rail and the spacer. Install the angled brackets on the carriage bolt (5).
Fasten with 5/8" serrated washer(13) and nut(14). Hand tighten.
8. Follow steps 10-12 on page 3. you will only be installing 4 knurled bolts(6) instead of the 8 called for in step 10. Remove the
heat shield around the spare tire if there is one and if it will give better access to the frame. Replace heat shield when done.
30095N 6/13/14 REV. K
Continued from previous page.
CAUTION!
4
16
13
14
1. After placing the rear rail in position as shown on the previous page,
position the front rail with the 5
locate the front rail. Drill an 1/8" hole in the bed using the holes shown in
the diagram shown above. Check to be sure the hole is in the center of the
bed sill.
2. Using the 1/8" pilot hole as a guide, drill the hole out with an 1-1/4" hole
saw. Using the pilot bit of the hole saw, dimple the bottom of the bed sill.
Drill this out to 21/32".
©2014 Cequent Performance Products, Inc.
This sheet used for same vehicles
from previous PAGE.
11
ONLY ONE LEG SHOWN FOR CLARITY
9
12
7
th
wheel legs in place. This will properly
5
10
2
8
6
PRINTED IN CHINA
10

Publicidad

loading