2
SELECTION OF INSTALLATION PLACE
• Install the air conditioner where there is sufficient strength to withstand the weight of the unit.
If the strength is not sufficient, the unit may fall down resulting in injury.
• Install the air conditioner at a position keeping the height by 2.5m or more from the floor.
If you insert your hands or others directly into the unit during running of the air conditioner, it is dangerous
because you may contact with revolving fan or active electricity.
• Do not install the air conditioner in a location subject to a risk of exposure to combustible gas.
Otherwise, the combustible gas leaks, stays around the unit and a fire may occur.
Upon approval of the customer, install the air conditioner in a place that satisfies the
following conditions.
• Place where the unit can be installed horizontally.
• Place where a sufficient servicing space can be ensured for safe maintenance and check.
• Place where drained water will not cause any problem.
• Make sure that the user cannot access the unit main body after the installation.
Avoid installing in the following places.
• Place exposed to air with high salt content (seaside area), or place exposed to large quantities of sulfide gas
(hot spring). (Should the unit be used in these places, special protective measures are needed.)
• Place exposed to oil, vapor, oil smoke or corrosive gas.
• Place where organic solvent is used nearby.
• Place close to a machine generating high frequency.
• Place where the discharged air blows directly into the window of the neighboring house. (For outdoor unit)
• Place where noise of the outdoor unit is easy to transmit.
(When installing the air conditioner on the boundary with the neighbor, pay due attention to the level of noise.)
• Place with poor ventilation. (Before air ducting work, check whether value of air volume, static pressure and
duct resistance are correct.)
Installation space
Secure the space required to installation
and servicing.
100 or more
240
or more
WARNING
CAUTION
In case of continues the operation of the indoor unit under
high-humidity conditions as described below, dew may
condense and water may drop.
Especially, high-humidity atmosphere (dew point temperature
: 23°C or more) may generate inside of the ceiling.
300 or more
1. Unit is installed inside of the ceiling with slated roof.
for service space
2. Unit is installed at a location using inside of the ceiling as
3. Kitchen
If installing a unit at such place, adhere insulating material
(glass wool, etc.) additionally over all the positions of the
indoor unit which come to contact with high-humidity
atmosphere.
Set a check port at right side of the unit (size: 450 x 450mm)
for piping, maintenance, and servicing.
Selection of installation place
fresh air take-in path.
Advice