ASSEMBLY
UNPACKING
Unpack the equipment where you will be using it. Place the carton on a level flat surface. It is
recommended that you place a protective covering on your floor. Never open box when it is on its side.
IMPORTANT NOTES
During each assembly step, ensure that ALL nuts and bolts are in place and partially threaded.
Several parts have been pre-lubricated to aid in assembly and usage. Please do not wipe
this off. If you have difficulty, a light application of lithium grease is recommended.
SERIAL NUMBER LOCATION
SERIAL NUMBER
S-DRIVE PERFORMANCE TRAINER
MODEL NAME:
* Use the information above when calling for service.
4
MX15_T-DPT_TREADMILL_OM_r1_0_MULTI.indd 4-5
WARNING!
There are several areas during the assembly process that special attention must be
paid. It is very important to follow the assembly instructions correctly and to make
sure all parts are firmly tightened. If the assembly instructions are not followed
correctly, the equipment could have parts that are not tightened and will seem
loose and may cause irritating noises. To prevent damage to the equipment, the
assembly instructions must be reviewed and corrective actions should be taken.
NEED HELP?
If you have questions or if there are any missing parts, contact Customer
Tech Support. Contact information is located on the information card.
TOOLS REQUIRED:
F 8mm T-Wrench
F 5mm Allen Wrench
F 6mm Allen Wrench
F Phillips Screwdriver
PARTS INCLUDED:
F 1 Base Frame
F 2 Front Handlebar Supports
F 2 Rear Handlebar Supports
F 1 Sled Bar
F 1 Handlebar Set
F 1 Harness
F 1 Hardware Kit
1
Note: There are no screws holding on the motor cover.
Black Hardware Bags (x2)
2
Description
Qty
A
Bolt
4
B
Flat Washer
4
Note:
Do not fully tighten hardware
until the end of step 5.
Step 2 Torque Value:
78.4 Nm / 57.8 ft-lb
A
B
5
12/17/15 8:51 AM