2) Next 50 minutes:
Do not exceed half throttle (approxi-
mately 3,000 r/min). Vary engine
speed occasionally. If you have an
easy-planing boat, accelerate at full
throttle onto plane, then immediately
reduce the throttle to 3,000 r/min or
less.
3) Second hour:
Accelerate at full throttle onto plane,
then reduce engine speed to three-
quarter throttle (approximately 4,000
r/min). Vary engine speed occasional-
ly. Run at full throttle for one minute,
then allow about 10 minutes of opera-
tion at three-quarter throttle or less to
let the engine cool.
4) Third through tenth hours:
Avoid operating at full throttle for
more than 5 minutes at a time. Let the
engine cool between full-throttle runs.
Vary engine speed occasionally.
5) After the first 10 hours:
Operate the engine normally.
EMU00204
PRE-OPERATION CHECKS
w
If any item in the pre-operation check is
not working properly, have it inspected
and repaired before operating the out-
board motor. Otherwise, an accident
could occur.
cC
Do not start the engine out of water.
Overheating and serious engine damage
can occur.
3-6
GB