Energi Savr Node
Load Wiring (continued)
Pass Through Wiring Example B:
4 Circuits, Single Feed
Distribution
Panel
Line
Neutral
Neutral
Neutral
Neutral
Ground
Ground Bar
Ground
Zone Switching Wiring:
• Two (2) 1,0 mm
to 4,0 mm
2
2
• Strip length: 8,0 mm
• Torque: 0,79 N
m
•
Energi Savr Node
QS for 0-10 V / Switching Installation Guide
TM
QS for 0-10 V / Switching
TM
0-10 V Zones:
(QSNE-4T10-D only)
Zone Switching:
220-240 V~
|
Installation Guide
0-10 V Wiring
(QSNE-4T10-D only)
LOAD
LOAD
LOAD
LOAD
0-10 V Wiring (QSNE-4T10-D only)
• 1,0 mm
to 4,0 mm
2
2
• Strip length: 6,0 mm
• Torque: 0,5 N
m
•
• 0-10 V zones 1-4 are double-insulated from all
other inputs and outputs.
• 0-10 V zones 1-4 are not insulated from each
other. They share the same common (negative "–"
terminals are internally connected to each other).
• Connect only SELV/PELV circuits, or connect only
non-SELV/PELV circuits to 0-10 V zones 1-4. Do not
mix SELV/PELV circuits and non-SELV/PELV circuits.
• Follow all national and local codes for separation
requirements.
Lutron
5
|
®