COVERING INSTALLATION BIJOUX
PHASE C
4
D
47
G
52
58
F
I
79
PHASE D
FASE 5
74
74
69
53
53
58
F
I
H
FASE 6
PHASE E
PHASE C
FASE 5
71
CERAMIC FRONT PANEL ASSEMBLY:
69
• Line up the holes in the upper ceramic front panel (53) with the corresponding
holes in the front grille (69).
53
• In order to fasten the upper ceramic front panel (53) to the upper front grille (69),
E
insert the knurled washer onto the thread of the pin and tighten it manually
(without the use of any tools).
• Assemble the grille including the ceramic panel to the boiler-stove, putting suita-
53
ble pressure to hook it on to the stop springs
58
Remove the lower front cast iron grille (52) by applying suitable pressure to release
F
it from the special locking springs.
I
• Line up the holes in the lower ceramic front panel (53) with the corresponding
H
71
holes in the front grille (69).
• In order to fasten the lower ceramic front panel (53) to the lower front grille (69),
insert the knurled washer onto the thread of the pin and tighten it manually
(without the use of any tools).
• Assemble the grille including the ceramic panel to the boiler-stove and screw in
FAS
the previously removed grille stop screws.
78
PHASE D
CERAMIC TOP ASSEMBLY:
• Place the ceramic top (79) over the cast iron boiler-stove top
• If the ceramic top proves unstable, remove it
• Stability of the ceramic top is to be carried out, where necessary, using the provi-
ded washer between the pad and the cast iron top
• Reposition the ceramic top
PHASE E
• The boiler-stove is now ready to be positioned.
- 41
-