Descargar Imprimir esta página

EdilKamin BIJOUX Instalación Uso Y Mantenimiento página 43

Ocultar thumbs Ver también para BIJOUX:

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

  • MEXICANO, página 86
COVERING INSTALLATION TRESOR
PHASE A
FASE 1
PHASE B
D
47
G
52
58
F
I
PHASE C
79
74
74
PHASE D
PHASE A
• This phase presents the boiler-stove after being unpacked and positioned in the
room
PHASE B
71
• Remove the cast iron front panels (69 -52) that are slotted in, then with the screws
69
(71) provided, mount the ceramic front panels (53) onto the cast iron panels (69-
52), and reposition them.
53
E
53
58
F
I
H
71
PHASE C
• Position the cast iron top (78), the three pads (74) in their housing, then place the
ceramic top (79) over.
78
PHASE D
• The boiler-stove is now ready to be positioned.
- 43
-

Publicidad

loading

Este manual también es adecuado para:

CameoStrassTresor