Masonry Chimneys; Prefabricated Chimneys; Chimney Height; Wall Pass-Throughs - Jøtul F 600 Instrucciones Para Instalación

Ocultar thumbs Ver también para F 600:
Tabla de contenido

Publicidad

Masonry Chimneys

When installing the Jøtul F 600 into a masonry chimney
you must conform to all of the following guidelines:
• The masonry chimney must have a fireclay liner or
equivalent, with a minimum thickness of 5/8" and must
be installed with refractory mortar. There must be at
least 1/4" air space between the flue liner and chimney
wall.
• The fireclay flue liner must have a nominal size of 8"
X 8", and should not be larger than 8" X 12". If a round
fireclay liner is to be used it must have a minimum inside
diameter of 6" and not larger than 8" in diameter.
• If a chimney with larger dimensions is to be used, it
should be relined with an appropriate liner that is code
approved.
• The masonry wall of the chimney, if brick or modular
block, must be a minimum of 4" nominal thickness.
A mountain or rubble stone wall must be at least 12"
thick.
• A newly-built chimney must conform to local codes and
in their absence must recognize national regulations.
When using an existing chimney, it must be inspected
by a licensed professional chimney sweep, fire official,
or code officer, to ensure that the chimney is in proper
working order.
• No other appliance can be vented into the same flue.
• An airtight clean-out door should be located at the base
of the chimney.

Prefabricated Chimneys

If a prefabricated metal chimney is to be used it must be
a chimney type that is tested and listed for use with solid
fuel burning appliances.
That means a chimney that is tested to the following:
High Temperature (HT) Chimney Standard UL 103 for
the U.S. and High Temperature Standard ULC S-629 for
Canada.
The manufacturer's installation instructions must be
followed precisely. Always maintain the proper clearance to
combustibles as established by the pipe manufacturer. This
clearance is usually a minimum of 2", although it may vary
by manufacturer or for certain chimney components.

Chimney Height

Whether a masonry chimney or prefabricated metal
chimney is used it must be the required height above the
roof line.
The requirement is:
The chimney must be at least 3 feet higher than the highest
point where it passes through the roof and at least 2 feet
higher than the highest part of the roof or structure that
is within 10 feet of the chimney, measured horizontally.
See figure 3, page 13.
Chimneys shorter than 14 feet may not provide adequate
draft. This could result in smoke spilling into the room from
the stove when loading the stove, or when the door is open.
In addition, inadequate draft can cause back puffing, which
is a build up of gases inside the firebox.
Other times, chimney height can create excessive draft
which can cause high stove temperatures and short burn
times. Excessive drafts can be corrected by installing a
butterfly damper. If you suspect you have a draft problem,
consult your dealer.

Wall Pass-throughs

When your installation unavoidably requires the chimney
connector to pass through a combustible wall to reach the
chimney, always consult your local building officials, and be
sure any materials to be used have been tested and listed
for wall pass-throughs.
In the U.S.
The National Fire Protection Association's publication,
NFPA 211, Standard for Chimneys, Fireplaces, Vents and Solid
Fuel Burning Appliances permits four methods for passing
through a combustible wall. Before proceeding with any
method be sure to consult with your local building officials
to discuss any local code requirements.
Common Method:
• When passing through a combustible wall to a
masonry chimney this method requires the removal
of all combustible materials from at least 12" around
the chimney connectors proposed location. With a 6"
round liner the minimum area required would be 31" x
31" square.
• The space is then filled with at least 12" of brick around
a fireclay liner. Remember, the liner must be ASTM C35
or equivalent, with a minimum wall thickness of 5/8".
• It is important to remember to locate the pass-through
at least 18" from the ceiling for proper clearance to
combustibles.
• It will be necessary to cut wall studs, install headers,
and construct a sill frame to maintain the proper
dimensions and to support the weight of the brick.
• The bricks must be solid brick with a minimum of
• 3 1/4 " thick (4" nominal).
• Refractory mortar must be used at the junction of the
chimney and the pass-through liner. The pass-through
liner must not penetrate the chimney liner beyond the
inner surface of the chimney liner. Use extreme care
when constructing the hole in the chimney liner, the
tiles can shatter easily. See figure 4, page 13.
In Canada
In Canada the standard has been established by the
Canadian Standard Association. The installation must
conform to CAN/CSA-B365, Installation Code for Solid Fuel
USA/cAnAdA
5

Publicidad

Tabla de contenido
loading

Tabla de contenido