1. GENERAL
1.1 Applications
Pumps designed to pump clear liquids, chemically
neutral, without abrasive particles in suspension, in the
fields of accommodation and industry.
• Heating
• Sanitary hot water
• Ice water
1.2 Specifications
• Maxi. service pressure
• Temperature ranges
• Flanges to ISO PN16
with gasket mating face : DN40 to 200
• Mini. suction heads
Using pumps at 2900 rpm may require special mea-
sures to damp the noise, for the building installations
showing special requirements for acoustic insulation.
2. SAFETY
Read this data sheet carefully before installing and
starting up. Pay special attention to the points concer-
ning the safety of the equipment for the intermediate
or end user.
2.1 Symbols used in the manual
Warning
Instruction concerning electricity
Calls attention to a potential risk that
ATTENTION !
might affect safety.

3. TRANSPORT AND STORAGE

When taking delivery of the equipment, check that it
has not been damaged in transit. If anything is found
wrong, take the necessary steps with the carrier within
the allowed time.
If the equipment delivered is to be installed at a
later time, store it in a dry place and protect it
from impacts and outside influences (moisture, frost,
etc.).
4. PRODUCTS AND ACCESSORIES
4.1 The pump
LRC : single head single-stage in-line pump
JRC : single-stage in-line pump
Suction-discharge ports are in line.
The tightness at center hump is ensured by self-lubrica-
: 16 bar
: -8 °C to +110 °C
DN160 impeller
: -10 °C to +130 °C
: DN250 and 360 impellers
: according to the pump
NPSH
ted mechanical seal, maintenance-free, with friction
faces:
Carbon/silicon carbide/extreme pressure gasket.
4.2 The motor
•Motor with extended shaft end.
•Built-in winding protection by thermal overload probe
(opening contact)PTO, or PTC pumps, impellers
DN360 (2.5V maxi. voltage per probe).
•Bearings are lifetime greased.
Speed of rotation
2900 rpm
≤ 4 kw 3-ph 230 - 400 V
Winding
over
Frequency
Insulation class
Protection index
4.3 Accessories (optional)
• Motor protection circuit-breaker • Control box Y1200
(JRC) • Weld-on round counter-flanges PN16
• Isolating valves • Anti-vibration sleeve • Blanking
cover with gasket (JRC) • 16-bar pressure gauge kit •
5. INSTALLATION
5.1 Mounting (See FIG. 1)
Install the pump in a place easy to reach and protec-
ted from frost.
If the pump is installed on a horizontal pipe, with
motor centerlines horizontal, it will be necessary
to switch operation between the pumps from
time to time, to prevent the formation of air pocket at
the high point of the casing.
For pumps whose motor is very heavy, provide a secu-
ring point (e.g. hoisting hook, ...) to allow easy dis-
mantling of the motor.
The pump can be installed directly on the pipe (hori-
zontal or vertical) or on a concrete foundation.
Mounting possible in all positions except with motor
down.
Direct connection to pipe, with motor centerline hori-
zontal:
•Horizontal pipe: up to 3 kW
•Vertical pipe: up to 9 kW and DN pumps, ports
40 to 125.
Provide suitable pipe clamps or supports.
Mounting on concrete foundation
- All types with securing through anchor bolts (moun-
ting plane, see FIG.2).
- The volume of the foundation must be commensura-
te with the pump weight and size.
- If the installation includes several pumps, they can be
mounted on the same foundation.
7
1450 rpm
3500 rpm
230 - 400 V
220 - 380 V 220 - 380 V
400 V ∆
400 V ∆
380 V ∆
50 Hz
50 Hz
60 Hz
F
F
F
IP54
IP54
IP54
1750 rpm
380 V ∆
60 Hz
F
IP54

Publicidad

Tabla de contenido
loading

Tabla de contenido