Chapter 2:
Assembly
2-1 NEOLIUM SX 2.10m platform assembly
Scaffolding must be erected, dismantled and modified by at least 2 people.
The working height is defined according to the user and the task to be carried out.
• Lock the castor wheels before each use by applying the brake with your foot.
2-1-1 Assembling the folding base
4. Open out the folding base.
5. Mount the folding base on rungs no. 2 and no. 4 following the steps below.
6. Mount the brace on rung no. 1.
1
102-02920515 - ind.C - 11/2021
F
Check the correct engagement
of the two hinges
45