Neolium 2.80M Platform Assembly - TUBESCA-COMABI NEOLIUM SX Instrucciones De Montaje Y De Uso

Tabla de contenido

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

  • MEXICANO, página 98
2-2 NEOLIUM SX 2.80m platform assembly
1. Repeat steps §2-1.1 to §2-1.4
2. Pre-mount the 2 cross braces and fasten them on rung no. 4 of the 2 x 6-rung extensions.
3. Assemble a 3-rung extension to the base of a 6-rung extension and pin them together with 2 x
Ø10 tube-clip pins.
4. Assemble the extension sets on to the scaffolding and pin together with 4 x Ø10 tube-clip pins.
5. Fasten the cross braces on rung no. 8 by following diagram §2-1.3.
1
3
2
4
5
102-02920515 - ind.C - 11/2021
51

Publicidad

Tabla de contenido
loading

Tabla de contenido