Chapter 5: Assembly For Transport And Access Through Doors; Chapter 6: Verification, Upkeep And Maintenance - TUBESCA-COMABI NEOLIUM SX Instrucciones De Montaje Y De Uso

Tabla de contenido

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

  • MEXICANO, página 98
Chapter 5:
Assembly for transport and access through doors
NEOLIUM SX mobile scaffolding fits through a door with a minimum width of 0.9m and a minimum height
clearance of 1.9m.
The scaffolding can also be used to transport equipment and small tools.
To extend the life of your scaffolding, it is recommended to store it away from bad weather.
Chapter 6:
Verification, upkeep and maintenance
CHECKS:
Inspect parts before each assembly, particularly:
- castor wheels tyres and brakes,
- safety devices (split pin, adaptor, etc.),
- working platform hooks and fasteners.
- the plywood on the working platforms.
- the stabiliser mounting brackets.
- the welds on the ladder rungs.
All parts with the following defects:
- permanent deformation.
- perforations.
- score marks (as a result of grinding, for example...)
- severe oxidation
- weld failure starting out,
... should be discarded!
If in doubt, change the part.
102-02920515 - ind.C - 11/2021
63

Publicidad

Tabla de contenido
loading

Tabla de contenido