TUBESCA-COMABI NEOLIUM SX Instrucciones De Montaje Y De Uso página 54

Tabla de contenido

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

  • MEXICANO, página 98
10. Pre-mount the 2 cross braces and fasten them on rung no. 1 of the 2 x 6-rung extensions.
11. Mount the 2 extensions on the scaffolding and pin together with 4 x Ø10 tube-clip pins.
12. Fasten the 2 cross braces on rung no. 8 by following diagram §2-1.3.
13. Mount the braces on rung no. 18, and the middle rails on rung no. 16, by following §2-1.6.
14. Mount the platform on rung no. 14.
15. Put the toeboards into position.
10
12
102-02920515 - ind.C - 11/2021
14
15
11
13
54

Publicidad

Tabla de contenido
loading

Tabla de contenido