Installation Procedure
Heat insulation
•
The HP gas pipe, the suction gas pipe and the liquid pipe should be heat insulated separately.
•
The material for the HP gas pipe and the suction gas pipe should endure the high temperature over 120°C. and
for liquid pipe, it should be over 70°C.
•
The material thickness should be over 10mm when the ambient temperature is 30°C, and when the relative
humidity is over 80%, the material thickness should be over 20mm.
•
The material should cling closest to the pipe without any gap, it should be then be wrapped with adhesive tape.
The connection wire cannot be put together with the heat insulation material and should be at least 20cm away.
Fix the refrigerant pipe
•
During the operation, the pipe will vibrate and expand or shrink.
If not fixed, the refrigerant will focus on one part and cause further damage to the broken pipe.
•
To prevent the central stress, fix the pipe every 2-3m
Model
38VT008173HQEE
38VT010173HQEE
38VT012173HQEE
38VT014173HQEE
38VT016173HQEE
38VT018173HQEE
38VT020173HQEE
38VT022173HQEE
38VT024173HQEE
38VT026173HQEE
Liquid pipe
Sound power
level(dBA)
Cooling
Heating
81
81
82
82
88
88
88
88
88
88
88
88
88
88
90
90
90
90
90
90
Connection wire
over 20cm
Adhesive tape
Gas pipe
Heat insulator
Weight(kg)
224
224
224
244
244
287
370
370
370
370
23