Installation; Internal Battery Rotation - Tripp-Lite SmartOnline SU5KRT3UHVMB Manual Del Propietário

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

Installation

Internal Battery Rotation

Your UPS ships with the batteries disconnected and in reverse orientation. Before mounting the UPS to your 4-post or 2-post rack, first
remove the battery trays and set them aside. To remove the batteries from the UPS, follow the instructions below.
If an external battery pack is to be used, it should be installed first in the lower part of the rack. Be sure to follow
instructions for Configuring External Battery Packs in this manual and in the BP192V12RT3US Owner's Manual
before proceeding with UPS installation.
WARNING! Battery rotation must be performed by qualified electrical service personnel.
1
Remove the six front screws from the front bezel, then retract
the bezel from the UPS. Hang the bezel on the available hook.
Note: The front panel display has an attached ribbon cable that
extends from the UPS to the front bezel. Make sure to keep this cable
out of the way when opening and closing the battery door.
2
Loosen the two captive screws securing the battery door.
3
Open the battery door. Ensure the smart battery
communications cable is safely out of the way when opening
the battery door and when removing the battery trays.
4
Using the handles attached to each tray, remove the battery
pack trays. Make sure to remove the handles before rotating the
batteries (see next step) and install the handles on the opposite
side.
It is recommended you remove the UPS internal batteries prior
to installation. Doing so will remove excess weight and allow for
safer handling.
Note: To reduce the weight of the UPS unit during installation, it is
recommended you proceed to 4-Post Mounting or 2-Post Mounting
instructions in the Rack Mounting section before rotating, reinstalling
and connecting the battery pack trays.
1
2
3
4
7

Publicidad

Tabla de contenido
loading

Tabla de contenido