Kohler 1000C Serie Guia De Instalacion página 12

Ocultar thumbs Ver también para 1000C Serie:
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

Top Track
Inside Panel
9. Install the Inside Door Panel
NOTE: Perform these installation steps from inside the bath/shower.
Move the inside panel to the inside of the bath/shower.
Lift the inside door panel with the rollers facing you.
Position the rollers on the inside rail of the top track.
Check the panel for proper alignment and smooth operation. Adjust as needed.
Adjusting the Rollers
Remove the door panel.
Loosen the roller screw(s) and move the roller(s) in the slot to align the panel.
Tighten the screws and reinstall the panel.
Install the Guide
Engage the guide in the back of the bottom track.
Slide the inside panel bottom flange into the groove of the guide.
Align the guide pin slot with the holes in the bottom flange.
Insert the guide pin through the guide pin slot and bottom flange hole. Push them in until they
snap into place.
Align the outside panel with the wall jamb opposite the showerhead side of the bath/shower.
1034041-2-A
Roller
Inside of Bath/Shower
Inside Rail
Guide
Bottom Track
Guide
Installed Guide
Bottom Flange
Fit bottom frame
flange into groove.
Fit this section
of guide into
bottom track.
12
Guide Pin Slot
Guide Pin
Guide Pin Slot
Sterling

Publicidad

Tabla de contenido
loading

Tabla de contenido