This section provides an overview of the connector and LEDs on the front panel.
Figure 1-1 SLG Front Panel
Connector – MONITOR OUT
A 50 Ω BNC connector provides the capability to monitor the RF signal.
STATUS LED
Provides an indication of the status of the instrument.
RF ON LED
Provides an indication that at least one carrier is present on L-band Out SMA or F