Ac Power Fuses; Instrument Startup; Switching Off The Instrument; Functional Check - Rohde & Schwarz R&S SLG Manual De Instrucciones

Tabla de contenido

Publicidad

R&S SLG

1.3.5 AC Power fuses

Before changing the fuses, switch off the instrument and disconnect it from the power
supply.
The instrument is equipped with one fuse (see section 7.5 of the User Manual). The
fuse is located beside the AC power switch (in the AC inlet) on the rear panel of the
instrument.
Changing the fuse:
Open the cover on the fuse box and remove the fuse holder.
Replace defective fuse and put the fuse holder back into place.
Close the fuse box cover.

1.3.6 Instrument Startup

Once the instrument has powered up, the unit must boot. During boot-up the status
LED on the front panel is amber. At completion of boot-up the status LED turns green
unless a fault has been detected in which case it turns red.

1.3.7 Switching Off the Instrument

Set the AC switch on the rear of the instrument to the O position. None of the LEDs
on the front panel should be lit.
Note:
If you set the power switch to the O position before the instrument settings have been
saved, the current settings will be lost.

1.3.8 Functional Check

The SLG automatically monitors the health of the instrument during power-up and
continuously during operation. When the instrument detects a fault the status LED
turns red. There are no serviceable parts. This means the unit must be returned to the
manufacturer for service.
Getting Started 2116.9035.02 - 07
In the event of a hazardous situation, unplug the device from power. Ensure the
power plug is easily reachable and accessible at all times.
Putting the Instrument into Operation
Preparing for Operation
9

Publicidad

Tabla de contenido
loading

Tabla de contenido