Plumbing System - Palazzetti ECOFIRE GINGER Generalidades - Advertencias - Instalación - Mantenimiento

Ocultar thumbs Ver también para ECOFIRE GINGER:
Tabla de contenido

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

5.8 PLUMBING SYSTEM

Connection to the plumbing system and the
plumbing system must be in compliance with
current national laws and standards, and realized
1. Make the water connections to the boiler body
as described on the datasheet in the Product
Booklet.
2. Make sure that all the control and safety
devices including those supplied with the
stove are installed correctly (safety and heat
exhaust valves).
You MUST NOT insert devices that completely
close the heating system (zone valves). For
safety reasons, the pump must ALWAYS run
while the stove is on, dispersing the heat
produced. If there is too much ambient heat,
put it out.
To access the water connections easily you can
care, however, to pass the pipes through the holes
on the rear panel.
5.8.1
A) Pressure gauge
B) Automatic release valve
C) Load tap
D)
E) Water return from the system (G3/4"F)
F)
Safety valve (G3/4"F)
G) Closed expansion vessel
H) Circulator
I)
Anti-condensation valve
5.8.2
Connect the stove to the heating system via
Prepare
a
diameter, which connects to the safety valve
(F) discharge.
A
32
waste
tube,
of
appropriate
B
I
H
C
D
G
A
E
F

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Ecofire elisabethEcofire noahEcofire idro

Tabla de contenido