Installation - J.P. SELECTA DOSI-FIBER 4 PLAZAS Manual De Instrucciones

Extractor para la determinación de celulosa y fibras
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

MANUAL DE INSTRUCCIONES CODIGO 80055 REV D OCT2018
CAUTION!!! IMPORTANT FOR YOUR SAFETY
J
.P. SELECTA s.a.u.

INSTALLATION

Place the equipment on a flat, horizontal and level surface, taking care
of leaving a space of about 10 cm. at the rear part and both sides.
1- Connect the cooler water inlet «1» (racord 3/8') with the 8 mm in-
ner dia. hose to a water tap with a minimum flow of 1 litre/minute.
2- Connect the cooler water outlet «2» (racord 3/8') with the 8 mm
inner dia. hose to a drainage.
3.- Connect the vacuum inlet «3» (racord 1/4') to a water jet pump
with the 5 mm inner dia. tube.
4- Connect the drainage residual outlet of the tray «4» (racord 1/4')
to a drainage.
5- Connect it into the mains.
2
1
3
4
Be sure that the voltage supply is the same that the on indicated
on the characteristics plate.
Do not use the equipment if it is not earthed.
If you change the plug bear the following in mind:
Blue cable: Neutral
Brown cable: Phase
Yellow/green cable: earth
The porous crucibles are made of borosilicate glass, with a
standard filter of porosity no.2 (40-70 micras).
A cold crucible must not be put directly into a muffle furnace at 500ºC
since the crucible would be immediately broken. To avoid it, please
follow one of the two options:
- Place the crucible in the cold furnace and then switch it on.
Ctra. NII Km 585.1 Abrera 08630 (Barcelona) España
e-mail: jpselecta@sefes.es - http://www.sefes.es/selecta
(Sujetas a modificaciones sin previo aviso)
IMPORTANT NOTE FOR THE
CRUCIBLE HANDLING
Tel (34 3) 770 08 77 Fax (34 3) 770 23 62
Pag.: 22
Dosi-Fiber unit
rear part )

Hide quick links:

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Dosi-fiber 6 plazas40005994000623

Tabla de contenido