Installation
6.
Strip the cable 8 mm on each wire and connect the CURVE device to the charger on the indicated pins.
NEO
3.4. Installation of the CURVEx3
CAUTION
The CURVEx3 device is made up of two elements: a three-phase energy meter and a Smart Gateway.
1.
Select the circuit on which you wish to install the CURVEx3.
At the meter output
PANEL
Home power
ENERGY
METER
METER
Contracted
power
Electric
vehicle
PANEL
power
2.
Install the CURVEx3 and the Smart Gateway next to each other, keeping the elements of each device that
allow infrared communication between them in contact.
CAUTION
The three-phase energy meter is designed to be installed on a DIN rail (DIN EN 60715).
ABV2013IQM01_ - Installation manual
NEO Pro
In the home circuit
ENERGY
PANEL
METER
Home power
METER
Contracted
power
Electric
vehicle
power
PANEL
Ingeteam
EN
ES
FR
IT
17