Installation
6.
Run an Ethernet cable with RJ45 connectors on both ends and connect it to the Smart Gateway and the
charger.
CAUTION
Connect it to either of the two RJ45 sockets on the charger.
NEO Pro (single-phase)
3.5. Connection of the charger to another charger or a
communications element
NEO Pro models have two local network sockets that, as well as allowing the connection of a three-phase energy
meter (see
"Installation of the
•
Connect the charger to communications equipment (modem, router, switch, etc.).
CAUTION
The equipment can be connected to either of the two sockets on the charger interchangeably.
ABV2013IQM01_ - Installation manual
CURVEx3"), also allow the following connections:
NEO Pro (three-phase)
Ingeteam
EN
ES
FR
IT
19