CONTINUITY
1. Insert RED test lead into V jack
COM jack
4
Continuity/Resistance
NOTE: The meter defaults to Continuity testing in this mode. Ensure
that the Continuity Testing icon
press the "SEL" button
2. Remove power from circuit.
3. Test for continuity by connecting conductor or circuit with test
leads. If resistance is measured less than 50Ω, an audible signal
will sound and display will show a resistance value indicating
continuity. If circuit is open, display will show "OL".
DO NOT attempt to measure continuity on a live circuit.
OPERATING INSTRUCTIONS
, and rotate function selector switch
once.
10
Black lead
Red lead
, and BLACK test lead into
5
setting.
is visible on the display. If not,
to the
2
13