ENGLISH
The trigger 6 is soldered to control cable. Remove this assembly from the handles 11 and 12. The cable gland 22
is part of this assembly.
Cut the Cable Tie 43 and slide back the Protective Sleeve 27 to expose the fi ttings on the Hydraulic Hoses 24
and 25. The Hydraulic Hoses can be removed from the Body 1 using 12mm and 14mm spanners.
The Quick Couplers - Male 9 and Female 10 can be removed from the Hydraulic Hoses 24 and 25 using 18mm
and 24mm spanners.
Assemble in reverse order to dismantling noting the following points:
Prior to assembly clean all threads on the Quick Couplers - Male 9 and Female 10 and the Hydraulic Hoses -
Return 24 and Pull 25. Then apply two to three layers of 10mm PTFE tape to the male threads on both of the
Hydraulic Hoses.
Once assembled, prime the tool as per the instructions on page 10.
5.8 PROTECTING THE ENVIRONMENT
Assure conformity with applicable disposal regulations. Dispose all waste products at an approved waste facility
or site so as not to expose personnel and the environment to hazards.
All numbers in bold refer to the General Assembly and Part List on pages 18, 19 and 20.
* Service Kit on page 13.
16
ORIGINAL INSTRUCTION