Descargar Imprimir esta página

Corghi ERCO HC3502 B Manual De Uso página 64

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

Since the lift is packed in a special wooden crate, it can only be handled using a pallet truck or fork-lift truck, fitting
the forks into the slots as shown in figure 2.
4.1 UNPACKING
After removing the packing materials, carefully inspect the various components of the equipment, checking for any
visibly damaged parts (control unit, lift frame). In case of damage do not use the equipment (the lift) and call in a
qualified technician (your local dealer).
WARNING
The box containing the accessories is packed inside the crate: DO NOT THROW IT AWAY WITH THE
PACKAGING
The packing materials (plastic bags, expanded polystyrene, nails, screws, wood blocks etc.) must never be left
within the reach of children as they constitute a potential hazard. Dispose of these materials in the designated
collection centers if they are polluting or non-biodegradable.
4.2 INSTALLATION AREA
An area of at least 4600 x 4200 mm, with a ceiling height of at least 3870 mm, is required for installation of the lift.
From the operator position, the operator is able to monitor the entire lift and its surrounding area. He must ensure
that there are no unauthorized persons, or objects which may cause hazards, in this area.
Before installing the lift, check the specifications of the supporting surface available, or prepare a surface with the
minimum characteristics stated below
64
4 – TRANSPORT AND INSTALLATION
A
B
C
Packing dimensions
510 mm
842 mm
2870 mm
Operator's manual [EN]

Publicidad

loading

Este manual también es adecuado para:

Erco hc4502 b