Descargar Imprimir esta página

Grundfos AMG Serie Instrucciones De Instalación Y Funcionamiento página 16

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

  • MEXICANO, página 188
21. Check the distance between the propeller and the
wall and the propeller and the bottom of the tank
when the motor bracket is resting on the depth
blocker. The mixer must under no circumstances
touch other installations, bottom or wall. This also
applies when the mixer is turned.
WARNING
Electric shock
Death or serious personal injury
Before making electrical connec-
tion, make sure to remove the
fuses or switch off the main switch.
Make sure that the power supply to
the control cabinet is switched off.
22. Connect the power supply cable to the terminals
in the control cabinet.
5.3.4 Installing a flowmaker
14
17
15
AFG flowmaker
16
Position numbers in figures AFG flowmaker and Top
fixation.
Pos.
1
2
3
3a
3b
4
5
12
13
14
15
17
20
31
Procedure
Nuts and screws should be tightened according to the
standard torques described in the mounting section,
13
unless the tightening torque is specified otherwise.
The propeller blades can be mounted before
installation of AFG.xx.150/180/230/260 or after the
12
crane has been installed.
5
20
2
4
3b
3
1
3a
Description
Bottom fixation plate
Column profile
Depth blocker
Front support leg
Back support leg
Motor bracket
Top fixation bracket including safety wire
Crane foot
Crane with winch
Crane foot for vertical installation
Lifting wire including shackle and wire
clamp
Cable clamp
Wire clamp
Hole for fastening a safety wire

Publicidad

loading

Este manual también es adecuado para:

Afg serie