Descargar Imprimir esta página

Kärcher BDP 50/2000 RS Bp Bc Manual De Instrucciones página 15

Ocultar thumbs Ver también para BDP 50/2000 RS Bp Bc:

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

  • MEXICANO, página 47
Pushing the device
While standing, the device is protected
against rolling off with the help of an electri-
cal immobilising brake. To push the de-
vice, you need to first unlock the
immobilising brake.
 Turn the steering wheel to the left so
that the release lever can be accessed
more easily.
 Press the unlocking lever down to un-
lock the parking brake.
Danger
Risk of accident if the device rolls off. Apply
the immobilising brake again immediately
after finishing pushing the machine by
pushing the unlocking lever down.
Caution
Risk of damage. Never move the appliance
faster than 7 km/h.
Unloading
Note
Take the foot off the aceelerator pedal,
press the emergency-stop button to imme-
diately deactivate all functions and turn the
key switch to the "0" position.
 Unscrew the wooden board from the
top side of the packaging (will be need-
ed as a ramp later).
 Loosen the screws and remove the
wooden cage.
 Cut plastic packing belt and remove foil.
 Loosen the fixing at the wheels.
 Place the wooden board at the back of
the appliance on the pallet as a ramp
and attach with screws.
 Remove both blocks from behind the
rear wheels.
 Loosen the flexible steering shaft from
the pallet.
 Swivel the top part of the appliance to
the front and remove the steering
wheel.
 Remove the key from the steering
wheel.
 Remove the nut and the sleeve from the
upper end of the steering shaft.
 Leave the bushing and the plastic
washer on the shaft.
 Push the upper end of the steering shaft
from the inside through the drilled hole
in the control panel.
 Install the nut and the sleeve onto the
upper end of the steering shaft.
 Slide the lower end of the steering shaft
onto the end of the rotary shaft on the
bottom of the appliance.
 Swivel the top part of the appliance
back and check if the flexible steering
shaft slides down on the rotating axle.
 Remove the nut from the upper end of
the steering shaft.
Caution
Risk of damage for the steering shaft. Only
turn the steering wheel when the top part of
the appliance is closed.
 Insert the steering wheel and straight-
align the front wheel.
 Pull out the steering wheel, align and in-
sert back.
 Fasten the steering wheel using en-
closed nut.
 Insert the cover in the steering wheel.
 Press the unlocking lever down to un-
lock the parking brake.
 Slide the appliance backwards to re-
move it from the pallet.
 Push the lever for locking the the park-
ing brake upwards.
Start up
Inserting filter bag (option)
1 Closure filter chamber
2 Lid of filter chamber
3 Locking
4 Filter bag
 Open the closure of the filter chamber.
 Swivel the lid of the filter chamber up-
wards.
 Turn the locking device into a horizontal
position.
 Insert filter bag.
 Turn the locking device into a vertical
position.
 Close the lid.
 Snap the closure into place.
4
-
EN
Attaching the polishing pad
 Turn the programme selection switch to
Drive.
 Turn main key to "0" and remove it.
Removing the driver plate
1 Locking lever
2 Driver plate
 Push the locking lever inwards and hold
it there.
 Turn the driver plate in a counter-clock-
wise direction.
Attaching the polishing pad
1 Polishing pad
2 Retaining ring
 Compress the spring and remove the
retaining ring.
 Place the pad on the driver plate and
align it on the collar in the middle of the
driver plate.
 Attach retaining ring, push it down and
let it snap in place.
 Press the pad down on the driver plate.
Inserting the driver plate
 Push the locking lever inwards and hold
it there.
 Lift the driver plate and push it against
the catch in the polishing head.
 Turn the driver plate in a clockwise di-
rection until it has snapped into place in
the catch.
 Release the locking lever.
Operation
Note
Take the foot off the aceelerator pedal,
press the emergency-stop button to imme-
diately deactivate all functions and turn the
key switch to the "0" position.
 Carry out maintenance jobs "Prior to
operation" (see section "Maintenance
and Care").
15

Publicidad

loading

Este manual también es adecuado para:

Bdp 50/2000 rs bp pack