__________________________________________________________________________
3. Assembly
The neutralisation station is formed by a neutralisation tank and connections for the inlet and outlet
pipes. The neutralization tank comprises, in the flow direction, an ash sedimentation area, a
neutralization granulate area and a condensed water collection area. For the N-210 model, the
granulate can be adapted in different ways to function in accordance with the performance of the
boiler.
On the N-70 model, an overflow opening above the flow sleeve allows the condensates to come out
at a precise location when they are prevented from flowing through the discharge pipework.
1 – Tank
2 – Plug
3 – Cover
1 – Tank
2 – Distribution plates
3 – Connection for DN 20 or DN 25
4 – Flat seal
5 – Nut
6 – Filter plate
7 – Cover
8 – Screw
9 – Flat seal
10 – Support bar
11 – DN 25 pipe connection (outlet)
______________________________________________________________________________________________________________________________________________________________________
00ANO0001-#
pipe (inlet)
Fig. C-1: N70 components
Fig. C-2: N210 components
-
- 19
Neutralisation Station
Neutra-N70 ; -N210
GB