2.1. Preliminary work
 Unpack all the components of the station and check that there are no missing parts (for the content
of the supply, see section C) ; also check that they are in perfect condition.
 Define an installation site so that the inlet and outlet pipes are as short as possible.
 Remove the cover from the neutralization tank.
 For the N-210 model, adapt the neutralisation granulate filling area to the performance of the
condensing boiler to be connected. To do so, assemble the plates as shown in figs. D-4 and D-5.
 Insert the neutralisation granulate as shown in figs. D-2, D-3, D-4 and D-5.
 As may be required, install the accessories as detailed in the user manual supplied.
______________________________________________________________________________________________________________________________________________________________________
00ANO0001-#
Fig. D-1: Assembly example
Fig. D-2: N-70 granulate filling height
-
- 23
Neutralisation Station
Neutra-N70 ; -N210
GB