10.) After installing the conversion kit, verify the location of the
thermocouple and igniter Pin using the illustration below.
11.) Note to installation technicians: Verify the manifold pressure by using a
3/8" flared T-junction at the location marked by the arrow below. Then, using
a digital manometer, verify that the pressure before the orifice is 7" W.C. Also
verify that the orifice spud has the 2.9 mm stamp. This will allow you to verify
that the input rating of the appliance is correct.
Installing at Altitude
For installations at elevations above 2,000 ft., contact your local dealer or gas
supplier before installing because input rating should be reduced
approximately 4% for each 1,000 ft. above sea level. Refer to the National Fuel
Gas Code. Contact Real Flame for more information at 1-800-654-1704.
NATURAL GAS CONVERSION
Thermocouple
NOTE: Igniter housing removed for example only.
.25"
Igniter Pin
8
To Manometer