English
"Before using the machine make sure that:
the main electricity supply ON/OFF switch is ON;
!
the water supply and water softener taps are open ."
At the end of the day, turn the machine OFF by turning the main ON/OFF switch (1) to position 0.
!
" Don't switch on the gas installation when the
boiler is under pressure ".
Before using the machine check that:
- the main electricity supply ON/OFF switch is ON;
- the main water supply tap is open .
- the gas supply tap is open.
Turn the main switch ON/OFF (1) to position 1.
The machine completes the operations described under " Daily Switch-
On ".
Press and turn the gas tap knob (4) counter-clockwise and repeatedly
press the piezoelectric switch-on push-button (3) until the burner under
the boiler lights up.
Check through the observation window that the burner is lit and, after
a few seconds, release the knob (4).
"Heating" now begins.
At the end of the day, switch off the machine by turning the ON/OFF
switch (1) to the "0" position and close the gas tap (4) by turning it to
the "0" position.
During heating, if one of the coffee dispensing switches (16, 17, 18,
19 or 20) is pressed, the machine dispenses a coffee at the
temperature reached at the time.
Heating is completed when the boiler gauge indicator (14) remains
stable in the green area.
Remove the filter holder, empty out any coffee grouts and fill it up with 1
or 2 servings of ground coffee, depending on the filter holder used.
Press the ground coffee down uniformly in the filter, using the grinder/
doser presser.
Remove any residues of ground coffee from the filter rim.
Fit and tighten the filter holder (10) on the coffee dispenser unit, positioning
the cup (or cups) under the nozzle (or nozzles) of the filter holder (10).
Gas installation switch-on (for + GAS machines only)
Delivery of the coffee
Daily Switch-On
Turn the main switch (1) to position 1. The "machine ON" indicator light
(12, only for M28 SELECTRON) lights up.
If the water level in the boiler is below the minimum level, the automatic
level indicator light (11) lights up, and the boiler is filled up to the optimal
level (indicator light 11 OFF).
Turn the main ON/OFF switch (1) to position 2.
"Heating" now begins.
Heating phase
The machine is now ready to dispense coffee, steam and hot water.
To make sure that the dispenser unit and the filter holder (10) are at
similar temperatures, press the START-STOP push-button (20) and
let the machine dispense coffee for a few seconds. Then press the
START-STOP push-button (20) to stop dispensing.
Press the coffee dispensing push button (16, 17, 18 or 19) for the required
serving; the machine will stop automatically.
Press the START-STOP push button (20) for continuous dispensing.
Dispensing, whether for dosed servings or in the continuous dispensing
mode, can be interrupted at any time by pressing the START-STOP
push button (20).
M28 SELECT
L 3
M28 SELECTRON
4
English
4
N
3