Descargar Imprimir esta página

SUHNER LWC 10 Documentación Técnica página 17

Ocultar thumbs Ver también para LWC 10:

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

  • MEXICANO, página 20
Hold spindle by wrench flats with open end wrench and
release/tighten down collet chuck with open end wrench.
Perform a trial run a minimum over a period of 30 seconds
without load.
3.2 w
orKing instructions
On failure of the compressed air release the valve
lever! To achieve an optimum result, move grin-
ding tool uniformly back and forth with light pres-
sure. Excessive pressure lessens the working capability
of the machine, as well as the life of the grinding tool.
4. S
ERvICE
4.1 P
reVentiVe mAintenAnce
Without a tool clamped in check no-load
speed periodically and after each mainte-
nance. Even if the machine still operates
perfectly, the motor should be removed, cleaned and the
four slides checked for wear by a specialist after approx.
300 to 400 operating hours. The lubricant in the gear
head (Isoflex NBU 15) should be replaced at the same
time (do not wash out!).
/ m
aINTENaNCE
17

Publicidad

loading